Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Residential Wall Structure: | Wallboard |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Using a combination of metal construction and pre-fabricated components provides three main advantages:
Cost.
Because erection labor is drastically reduced, you can save as much as 30% or more over more traditional construction methods.
Speed.
Because many of the components are pre-fabricated at our plant, construction time is greatly reduced.
Durability.
Steel building components are guaranteed to last 20 to 30 years without repainting or other maintenance.
Steel Structure Information:
Type | construction building |
Wide span | single span or multiple spans, the max span clear distance is 36m, without middle column |
Roof and Wall | option: Steel sheet,EPS, fiber glass, rock wool or PU sandwich panel |
Door and Window | PVC or Aluminum alloy; sliding door or rolled door |
Column and Beam | Option: hot rolled or welded H section, I section; painting or galvanized |
Purlin | Option: C-section or Z-section |
Local Climate | 1. Wind speed 2. Snow load 3. Rain quantity 4. Earthquake grade if have More details is preferred. |
Crane Parameter | If need crane beam, crane tons parameter and lift height are needed |
Drawing | 1. according to clients' drawing |
2. design as per clients' dimension and requests | |
Package | Naked loaded in shipping container or as per requests. |
Loading | 20 GP, 40HP, 40 GP, 40 OT |
Our Technical Advantages:
A. We have our own technical teams, so we can design, fabricate and install this steel structure workshop according to customers requirement. |
B. It's very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service. |
C. One stop shopping---we offer not only steel structure but also sandwich panels and all the accessories. It will ensure the perfect integration between each part. |
D. fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection. |
E.We have pretty good preservative treatment on this steel frame as follows, 1. Clean the steel( reach to Sa2.5 Grade, China Code), then we will spray paint: 2 layer epoxy zinc rich primer and 2 layer antirust paint( total thickness: 100-120um); Warranty period: 18-20 years under normal conditions. 2. Hot-dipped galvanized, when the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um; when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions. |
Features:
1. Item Name: steel structure warehouse/ workshop