• China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse
  • China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse
  • China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse
  • China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse
  • China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse
  • China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse

China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse

Grade: Q345, Q235
Service: Design, Engineering, Erection
Drawing: Design The Drawing as Your Demand
Surface Treatment: Painted or Hot-DIP Galvanized,Zinc Coating
Technology: Welded Steel, Hot Rolled Steel
Rust: Blast Cleaning, up to Level SA2.5s
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Wiskind-Steel Structure
Wind Speed
0 to 360km/H
Crane
with or Without (1 to 250 Tons)
Roof and Wall Panel
EPS/Rock Wool/Polyurethane/MGO/Cement Foam Panel
Flooring
Concrete or Cement Board or Plywood
Delivery Time
Within 20 Days
Material
Q345b Steel, H Column
Drainage
Gutter and Downpipe
Advantage
Anti-Earthquake,Stormproof,Easily Installation
Other Feature
Energy-Saving,Anti-Erosion,Economical
Transport Package
Export Standard Packing
Specification
Welding H-shaped steel
Trademark
Wiskind
Origin
Shandong, China
HS Code
7308900000
Production Capacity
2000 Tons/ Month

Product Description

Advantage:
1.Flexible layout, low foudation cost
2.Easy installation
3.Recyle using

Steel structure progress

China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse
 
components
 
Base
 
Cement and steel foundation bolts
 
Main frame
 
H beam
 
Material
 
Q235B, Q345B or others as buyers' requests.
 
Purlin
 
C or  Z purlin
 
Bracing
 
X-type or other type bracing made from angle, round pipe
 
Bolt
 
Plain bolt and High-strenth bolt
 
Roof & wall
 
Sandwich panel with EPS,PU,Rockwool etc.or color steel sheet
 
Door
 
Sliding or rolling door
 
Window
 
Aluminium alloy window
 
Surface
 
Two lays of Anti-rust Painting or Hot Dip Galvanized
 
Sheet
 
0.5mm or 0.6mm galvanized sheet
 
Accessories
 
Semi-transparent skylight belts, Ventilators,
down pipe, Glavanized gutter, etc

 
Usages
 
1. workshop, warehouse, plant
2. Steel web frame structure
3. Steel H-column and steel H-beam
4. Portal frame products
5. High rise building project
6. Others steel structure buildings

 
Packing
 
Main steel frame without packing load in 40' OT,
roof and wall panel load in 40' HQ!

 
Drawing:
 
According to drawings or according to customer ' s requirement.
 
 
Design Parameters

 
If you need we design for you, please supply us the following parameter
together with detail size:
1) length, width, height, eave height, roof pitch, etc
2) wind load, snow load, raining condition, aseismatic requirements, etc
4) Demands for doors and windows
5)Other information if necessary

 

Our workshop
China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse


Our projects
China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse

Our customers
China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse
China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse

FAQ
1. Do you provide on-site installation service?
 General projects, we can provide Installation guide service based on customers' request.

2.What's your delivery time? 
 Normally, delivery time is 35days after receiving deposit. Large order delivery time should be arranged separately.
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
4. How to deal with quality problems?
Warranty is 3 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

5. What designs do you have in different climates (How can the products adopt to different climates)?
Strong wind region:   improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve the anti-pressure ability of the structure.
High corrosion region: use corrosion resistant material, or paint anticorrosive coating.


Welcome to visit our company!
China Prefabricated/Prefab House Best Metal Shed Materials Building Steel Structure for Hangar/Storage/Warehouse

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
50000000 RMB
Plant Area
>2000 square meters