• 2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project
  • 2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project
  • 2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project
  • 2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project
  • 2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project
  • 2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project

2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project

Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Steel Walkway and Floor, Steel Structure Bridge
After-sales Service: Packing&Shipping&Onsite Construction Guide
Warranty: 1 Year
Type: H-Section Steel
Standard: GB, ASTM, DIN, JIS, AISI, BS
Trademark: Carbon Structural Steel, Wiskind
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Our Advantages
Overview

Basic Info.

Model NO.
Steel Structure-46
Forming
Hot-Rolled Steel
Connection Form
Bolt Connection
Member
Steeltruss
Type of Steel For Building Structure
High-Strength Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wallboard
Steel Material
Q235B and Q345b
Connection Type
Bolted Connection
Preservative Treatment
Twice Painted
Column and Beam
Hot Rolled or Welded H
Loading
20 Gp, 40HP, 40 Gp, 40 Ot
Transport Package
Standard Sea Package
Specification
ISO, SGS, BV
Origin
Shandong Province
HS Code
94069000
Production Capacity
3000 Ton/Month

Product Description

Product Description

2024 Light Steel Structure Warehouse/Factory Storage with overhand carne one-stop project



2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project
2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project
1.Steel Structure Information: 
Type construction building
Wide span single span or multiple spans, the max span clear distance is 36m, without middle column
Roof and Wall option: Steel sheet,EPS, fiber glass, rock wool or PU sandwich panel
Door and Window PVC or Aluminum alloy; sliding door or rolled door
Column and Beam Option: hot rolled or welded H section, I section; painting or galvanized
Purlin Option: C-section or Z-section
Local Climate 1. Wind speed
2. Snow load 
3. Rain quantity
4. Earthquake grade if have
More details is preferred.
Crane Parameter  If need crane beam, crane tons parameter and lift height are needed
Drawing  1. according to clients' drawing
 2. design as per clients' dimension and requests
Package Naked loaded in shipping container or as per requests.
Loading  20 GP,  40HP, 40 GP,  40 OT
 
2.Our Technical Advantages:
A. We have our own technical teams, so we can designfabricate and install this steel structure workshop according to customers requirement.
B. It's very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service.
C. One stop shopping---we offer not only steel structure but also sandwich panels and all the accessories. It will ensure the perfect integration between each part.
D. fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection.

E.We have pretty good preservative treatment on this steel frame as follows,

  1. Clean the steel( reach to Sa2.5 Grade, China Code), then we will spray paint: 2 layer epoxy zinc rich primer and 2 layer  antirust paint( total thickness: 100-120um); Warranty period: 18-20 years under normal conditions.

  2. Hot-dipped galvanized, when the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um;  when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions.


2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project
3.Oversea Projects List:
1. Benz workshop  ( 26000sqm)    2. The shanghai world expo German museum            
3.Shen yang North Railway station   4.Coca-Cola (China)Beverages Co.,Ltd
5.Institute of Nuclear Tsinghua University.    6. Brazil power plant
7.Sichuan earthquake prefabricated house 2000units for free   8.Oman gymnasium
9.Residential for Low-income families in Angola   10.Supermarket for Belarus.    
11.Austrialia  XX engineering workshop.   12. Racks warehouse for Ukraine.   
13. Residential buildings  of Venezuela.      14.  180 units prefabricated house for Chile       
15. 20000 m PU sandwich panels for Brazil     16. 110000 m PU sandwich panels for America.   

 

 4.Features:

 
Steel structure workshop included the main structure( steel beam/girder, steel column/pillar), the secondary structure( roof and wall purlin, steel bracing, tie-bar, etc), door and windows, and other accessories.
 

2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project

 

Detailed Photos

2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project2024 Light Steel Structure Warehouse/Factory Storage with Overhand Carne One-Stop Project

Product Parameters
Parameters Description
Building dimension Length/Width/Height/Roof slope
Wind load Maximum wind speed in fifty years
Snow load Do your local have snow,or how big of the snow
Rainfall capacity What's the Rain precipitation?
Classes of seismic measure Anti-seismic level requirements
Is there have OVERHEAD CRANE? Crane data,including the crane tons,crane weight,maximum wheel pressure,lifting height,how much space is there above the crane.
Our Advantages

Steel Building Benefits 
Using a combination of metal construction and pre-fabricated components provides three main advantages: 

1.Cost. 
Because erection labor is drastically reduced, you can save as much as 30% or more over more traditional construction methods.

2.Speed.
Because many of the components are pre-fabricated at our plant, construction time is greatly reduced.

3.Durability.
Steel building components are guaranteed to last 20 to 30 years without repainting or other maintenance. 

 

Warmly welcome to visit our company!

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
50000000 RMB
Plant Area
>2000 square meters